Bathroom Remodeling in Austin, TX
Austin Bathroom Remodeling at a Glance
- Typical cost: $8,000 to $35,000, averaging around $25,000 in 2026, with primary suites reaching $60,000 or more.
- Timeline: 1 to 3 weeks for a refresh, and 3 to 6 weeks for a full gut or primary-suite remodel.
- Permit: usually required, since most remodels touch plumbing or electrical. The City of Austin permit runs about $687, and we pull it for you.
- Biggest cost saver: keeping your existing layout, which avoids rerouting plumbing.
- Service area: Austin and the surrounding metro, from Tarrytown and Hyde Park to Cedar Park, Round Rock, and Lakeway.
Why Austin Homeowners Choose Together Design & Build
One Team From First Sketch to Final Walkthrough
When design and build live under one roof, decisions get made once and hold. The designer knows what the crew can execute. The project manager knows why a wall moved or a drain relocated. Nobody blames the other trade, because there is no other company to blame.
A Local Austin Studio and Material Showroom
We are not a national franchise routing your call to a call center. Our studio on South Congress lets you compare tile, quartz, and fixtures in person before you commit, which matters in a room where a single tile choice sets the whole tone. You can also browse finished baths in our project gallery.
How Much Does a Bathroom Remodel Cost in Austin?
- Cosmetic refresh ($8,000 to $15,000): new vanity, fixtures, tile, paint, and lighting, with the existing layout kept in place.
- Mid-range remodel ($15,000 to $30,000): new vanity and stone countertop, a tiled shower or tub surround, flooring, and updated plumbing and electrical.
- High-end or primary suite ($30,000 to $75,000+): custom tile, a walk-in or wet-room shower, a freestanding tub, a double vanity, and layout changes.
What Drives Austin Bathroom Remodeling Costs?
Do You Need a Permit for a Bathroom Remodel in Austin?
Bathroom Remodeling Services We Provide in Austin
Our Austin Bathroom Remodeling Process
01. Consultation & Planning
We visit your home, measure the space, and lock in scope, budget, and a fixed-cost contract before anything is demolished.
02. Design and Material Selections
You choose tile, vanity, fixtures, and finishes at our South Congress studio, and we produce the drawings the city and the crew both work from.
03. Permitting and Build
We pull the City of Austin permits, demo, waterproof, and manage the trades so plumbing, electrical, and tile land in the right order.
04. Completion and Walkthrough
We finish punch-list items, clean the site, and walk the bathroom with you before you use it.
Recent Austin Bathroom Remodels
Austin Neighborhoods and Communities We Serve
Austin Services Area
6000 S Congress Ave STE 101, Austin, TX 78745